Commercial Storage & Access

Mezzanine Edge Protection for People and Goods

Handrails, toeboards, loading gates and barriers need to protect exposed edges while allowing the floor to work efficiently.

Request a Quote

What the project needs to resolve

Handrails and midrails

Continuous guarding is set out around exposed edges and changes in level.

Toeboards

Small items are restrained from being kicked or pushed from the platform.

Pallet gates

Loading openings remain protected during transfer operations.

Stair interfaces

Guarding, landings and openings are coordinated with the staircase design.

Column and rack guards

Impact protection below the floor can be planned with the traffic routes.

Clear operating method

The design reflects how pallets, people and equipment actually use the edge.

Edge protection is part of the layout

Edge protection is part of the layout

Stair openings, loading positions, conveyors, pallet movement and maintenance access create interruptions in the perimeter. These should be resolved in the design rather than patched after installation.

General access and industrial areas can require different details. The intended use, people, loading method and risk assessment shape the appropriate system.

Pallet loading gates

Pallet loading gates

A loading gate should prevent an exposed edge during pallet transfer. The gate type, opening, headroom and forklift approach must suit the pallet and operating method.

Positioning matters: a gate too close to a staircase, column or narrow aisle can create congestion even if it technically fits.

Upgrading an existing mezzanine

Upgrading an existing mezzanine

Existing handrails, posts, toeboards and gates can be surveyed when a floor changes use or layout. Any alteration that affects structural loading, access or fire strategy may need wider review.

We supply edge protection as part of new mezzanine projects and can quote defined upgrade works where the existing structure is suitable.

Protect the value after installation

Loading zones need an operating procedure

The gate design and the warehouse procedure must work together. Define who controls the opening, where the pallet waits, how people are kept clear and when the edge returns to a protected condition.

Mark the loading zone and preserve enough space for the pallet and handling equipment without blocking a stair or escape route.

Changes that trigger a wider review

Adding a conveyor, relocating a staircase, increasing occupancy or changing a storage floor into offices can affect more than the handrail. Structural loads, fire strategy, access and Building Regulations information may all need review.

Do not treat guarding alterations as isolated fabrication until the intended use and original design are understood.

Edge-protection survey checklist

Opening dimensions

Measure width, height, surrounding guarding, overhead obstructions and the pallet or load to be transferred.

Operating route

Map the forklift approach, pallet set-down position, pedestrian route and nearest stair or escape path.

Existing structure

Identify the floor system, edge beam, post positions and any original drawings before fixing new equipment.

Required behaviour

Choose guarding or a loading gate that keeps the edge protected through the transfer cycle and is simple enough to be used correctly.

Photographs help with first review, but structural fixing and operating clearance need verification on site. The quote should define any guarding alterations and making good around the new gate.

Send available dimensions, photographs and desired programme with the enquiry. We can then identify what needs a measured survey and what can be priced or checked in advance.

Mezzanine Edge Protection FAQs

Exposed edges and openings need suitable guarding. The exact detail depends on use, access, loading and the applicable design requirements.

Often, after checking the opening, structure, headroom, pallet size and approach. The surrounding guarding may also need alteration.

It helps prevent small objects from being pushed or kicked off the edge and forms part of the overall guarding arrangement.

Potentially. The existing system and damage need surveying so compatible and structurally suitable work can be specified.

Turn unused height into working space

Send us your postcode, approximate floor area and what the space needs to do. We will arrange a no-obligation survey for your premises and build a clear proposal around your building.

Request a Quote